Colocation suite build-out
Scope. 18 cabinets in a leased colo suite, greenfield. Structured copper and fiber cross-connect, overhead tray, grounding, and full documentation.
The hard part. Their previous suite had been point-to-point patched and had become unworkable inside two years. The whole design brief was "make sure that can't happen again," which meant patch fields sized with real headroom rather than filled on day one.