Colocation suite build-out
18 cabinets, structured copper and fiber cross-connect, overhead tray, and a labeling scheme their NOC could actually navigate at 3am.
Structured cabling · Central Texas
Datum designs and installs structured cabling, fiber backbone, data center infrastructure, and wireless for Austin-area commercial and industrial facilities. Every link is certified to standard, tested, and handed to you with the results and as-built drawings. That's not an upsell — it's the deliverable.
What we install
Switches get replaced every five years. Access points every four. The cable in the walls stays for twenty-five — which is why it's the one part worth over-engineering, and the one part most jobs cut corners on.
Cat6 and Cat6A horizontal cabling, patch panels, work-area outlets, and pathway. Installed to TIA-568 and certified link by link.
From $185 per drop → Data centerRack and cabinet build, structured cable management, cross-connects, and ongoing moves-adds-changes with change control that holds up to audit.
How we price MACs → FiberSingle-mode and multimode backbone, fusion splicing, LC/SC termination, and OTDR plus insertion-loss certification with results you keep.
Testing & certification → WirelessPredictive and on-site surveys, AP placement and mounting, and in-building cellular for concrete and metal buildings where phones don't work.
Survey options → ClosetsNew closets built right, or existing ones untangled, re-dressed, labeled to TIA-606, and documented so the next person can find anything in ten seconds.
Remediation work → AdjacentConference room cabling, overhead paging, and the infrastructure side of camera and access-control systems, coordinated with your security integrator.
What we do and don't →Published pricing
Cabling is one of the easiest trades to price honestly, because the units are countable. We publish ours. If someone quoted you a lump sum with no drop count in it, this page will tell you a lot.
A 30-drop job and a 600-drop job are different businesses. Mobilization, pathway, and closet work amortize across the count, so large jobs land near the bottom of every range above — sometimes below it. We'll show you the break points rather than making you negotiate for them.
Core drilling, firestopping beyond standard penetrations, conduit and tray installation, ceiling and wall repair, after-hours premiums, and permits where required. All of it appears as its own line on your quote — never buried, never a surprise.
How a job runs
We walk the space with your drawings, count drops, check pathway, and photograph anything that'll surprise us later.
Drops, pathway, terminations, testing, documentation — each priced separately so you can cut scope without renegotiating.
Rough-in, terminate, dress. We work around your schedule, including nights and weekends for live facilities.
Every link tested to standard. Failures get fixed and retested, not explained away.
Test reports, as-built drawings, labeling schedule, and warranty registration. In your hands, not just in our file.
The deliverable
The difference between a cabling job that ages well and one that becomes a nightmare is entirely about what exists on paper when the crew drives away. Ask the last contractor who worked in your closet for a labeling schedule and see what happens.
Recent work
18 cabinets, structured copper and fiber cross-connect, overhead tray, and a labeling scheme their NOC could actually navigate at 3am.
640 Cat6A drops across three floors on a 9-week GC schedule. Finished four days early and every link passed on first test.
Scanners dropping in the racking aisles. On-site survey found the real problem was AP placement, not AP count — we moved 14 and added 6.
What clients say
"They handed us a binder. An actual binder, with every test result and a labeling schedule. We'd hired four cabling contractors before Datum and not one of them had ever given us paperwork."
"640 drops, nine-week schedule, and they finished early without one RFI to us. Our GC asked for their number before we'd even closed the job out."
"Another vendor quoted us twelve more access points. Datum surveyed it and told us we needed six, and to move the ones we had. That conversation cost them money and earned them a client."
Common questions
$185 to $310 per Cat6 drop installed and tested; $240 to $420 for Cat6A. Run length, ceiling construction and existing pathway are what move it, and jobs above 100 drops land toward the bottom of each range. Certification testing is included, not a line item. The full table is above — we publish it so you can sanity-check any bid you receive, including ours.
If the run supports desks and phones, Cat6 is genuinely fine and will be for years. Choose Cat6A when you're feeding Wi-Fi 6E or 7 access points, running multi-gig to workstations, or when you're building infrastructure meant to survive twenty years of unknown equipment. The cost difference is roughly 30% per drop — and re-cabling later is roughly 400%. We'll tell you which situation you're in without upselling you into the other one.
Yes. A large share of our work is nights and weekends in live facilities — hospitals, distribution centers, and data centers don't stop. After-hours carries a premium and it appears on the quote as its own line so you can decide whether it's worth it.
Regularly. We hold current insurance at levels commercial GCs require, we show up to coordination meetings, and we submit closeout documentation in whatever format the project requires. Ask any of our GC references how many RFIs we generate. It's the number we're proudest of.
It's some of our favorite work. We'll trace and label what's live, remove what's abandoned, re-dress the rack, and hand you documentation for a room nobody had documentation for. Usually a two- to four-day job per closet, and it pays for itself the first time someone needs to find a port fast.
It's a manufacturer system warranty covering both components and installation workmanship for the full channel, registered in your company's name. It requires certified installers and full test documentation on file, which is why we test everything — the paperwork isn't bureaucracy, it's what makes the warranty real.
Next step
Floor plans, a rack elevation, or a rough drop count is enough to start. You get a line-item quote — drops, pathway, terminations, testing, and documentation priced separately, so you can see exactly what you're paying for.
Mon-Fri 6:30am-6:00pm - after-hours and weekend cutovers by schedule